Company's name: | Flextronics Consumer Digital P&C(Zhuhai)Begin and end date: 2006-07-2008-05 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | PIE Supervisor |
Job description: | 1.Security management in whole company; 2.Designed and built a new factory independently, and saved 190,000 RMB from the air-condition issue; 3.Served for logistics,designed and introduced Kanban system firstly and successfully in Lexmark program; 4.Designed and improved the process,made the standard time,evaluated the manpower and productivity etc; 5.CIP:saved 60,000$ every monthe by improving the process and reducing the manpower; 6.Introducted 6Sigma and Lean into Lexmark program firstly,imporved the productivity in main frame line from 80pcs per hour by 28 operators to 100pcs per hour by 17 operators. |
Reasons for leaving: | Challenge myself and Promote my career |
|
Company's name: | MiTAC Shunda Computer Co.,LtdBegin and end date: 2005-10-2006-06 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | PIE Engineer |
Job description: | 1.Security for the whole company; 2.NPI for Tyan series product,made manufacturing production introduction,made the standard time,evaluated the productivity,improved the process and dealt with the probelms appeared in production; 3.CIP(Continuous Improvement Program ). |
Reasons for leaving: | Challenge myself |
|
Company's name: | Flextronics Industry Co.,Ltd(Zhuhai)Begin and end date: 2004-07-2005-09 |
Enterprise nature: | Soly foreign funded enterprisesIndustry: Communication/Telecom/Network Equipment |
Job Title: | Asst.IE Engineer |
Job description: | NPI(New Product Introduction) for X-BOX360 & Game Controller:set up the production lines,made the standard time,evaluated the productivity,focused on the whole process before mass production. |
Reasons for leaving: | Asst.IE Engineer |